This blog will provide a running diary of our upcoming build with Porter Davis.  We will keep this blog as up to date as possible to provide you with information on progress, issues and other aspects of the building process.  We hope this information will be useful for anyone building this (or a similar) design house with PD.  If anyone would like to ask questions about the sales, tender, contract or build stages please feel free!

We are build the "Waldorf Grange"... yes, the one plastered on the billboards adorning Melbourne's freeways of late :-)  The design comes in the 49 and 50 square option - we are building the 49.  Our project is a "knockdown - rebuild" in the inner south-east of Melbourne on a 615m2 east-west block.



The specifications of our build are almost identical to the PD Greenvale display home (pictured above), with several extras and options.  Specifically:


  • Long Island facade
  • Similar (not exactly the same) exterior colour scheme
  • Standard layout, with Feng Shui stair, upper bathroom and upper linen cupboard options
  • Hebel (AAC) construction
  • Hebel "power floor" (suspended concrete) top floor
  • Colorbond roof
  • Extended height ceilings
  • Double-glazed, timber-framed windows throughout
  • Dado wall panelling
  • Floor-to-ceiling windows in the family room void (as per display home) - very important (will cover this in the "Tender" section
  • Actron ESP Ultima ducted A/C
  • Miele appliances
If anyone would like more information about our inclusions / exclusions, please post a question.

We will cover each key stage in the process separately.  Overall we will say up front that the sales / tender and contract process with PD has been extremely smooth and enjoyable.  

#porterdavis #PD #waldorfgrange #knockdownrebuild #respectthedream #longislandfacade #hamptonsstylehouse #classichamptons #hamptonstyle

Tender Stage

This is the important stage as by this point, you would have made your structural decisions and no other changes will be made after this point.  Non-structural items however, you have up until Contract Stage to make changes.

This stage goes for an entire day so strap yourselves in.  You will attend PD's head office and sit down with a Tender Presenter where you will go through your potential build in great detail.

You will also see the actual plans / drawings of your house for the first time with all the dimensions and structural options selected during the sales phase.  Be sure to check everything as things can be easily changed during your Tender appointment.  The way PD has arranged this day is that everybody required, including pricing people, draftsmen, etc. are all on call via instant messaging, or just outside the meeting room, to provide answers and change the document if necessary.

This is the meeting where we realised that the 'void' windows in the family room (and if you are familiar with the Waldorf Grange you will know that these windows are the main feature of the family room, if the not the design!) were not included as standard.  We 'assumed' as it was such a feature of the house that it would be.  On the Plans we saw a small sliding window which we disputed but the drawings clearly showed sliding windows as opposed to double-height fixed windows. The tender presenter did apologise for the oversight and explained the windows were not standard and would cost extra.  She quoted on the spot and we accepted.  We were just relieved at this point it was picked up at Tender and not once the build was finalised.

A lot of upgrades were finalised at this meeting too.  For instance, the pricing for our Miele appliances and Actron ESP Ultima heating and cooling system.  We were relieved that PD did not "mark up" these items, but at most used retail price.  There were a few items such as the Stegbar Siteline windows we decided to use in our family room (the "void" area).  PD was not familiar with the Siteline product, and they could not price it during our Tender appointment.  However, they simply obtained a quote and updated us a few days later.

In the end, we were satisfied that the key items were covered during the Tender appointment.  We paid our 3% deposit and took out drawings and tender documents home.

Key tips for the Tender Appointment:


  • Ask for a PDF copy of your plans in advance of the appointment.  Study them over and over again. Check all key measurements, window dimensions, etc.
  • Make the time to take your plans out to the display home, walk through each room and compare the measurements in your plans to the display home.  If you have kids, we'd suggest not taking them... you need to take your time and concentrate :-)
  • Ensure you are absolutely comfortable with the structural options selected
  • Don't spend time before Tender worrying about aesthetics / colours / non-structural items - there's plenty of time to change these things before contract
  • If you have asked for any "customised" things during sales stage, make sure they are reflected on the plans
  • Remember - if it's not on the drawings, it's not being built
  • Again, Tender is really about locking down the structural aspects of the house.  This is a key phase as all your final plans and engineering drawings will be be prepared over the following 3-4 weeks before contract.  During that time, you can still change any non-structural aspect of the house.

I know we have said this several times, but the key to a smooth (and surprise-free) Tender process is to ensure you understand what is a standard inclusion, and what is optional.  In the lead up to Tender, we visited the display home at least 4 times, on each occasion focussing on key areas of the house... the kitchen being the main area you want to ensure is spot on.

Sales Stage

We initially met our sales consultant from PD at the display home who conducted a walk through of the entire house.  We cannot emphasise enough how important it is to question what is included in the base price and what is not.  Never assume that it is included as it is most likely not. Our sales consultant was very thorough and yet, a couple of things were missed but was thankfully picked up at Tender Stage. 

Once you have walked through and advised what you want to be included in your home, the sales consultant will provide you with an indicative quote.  We stressed to our sales consultant to provide us with a very conservative price estimate to ensure we did not encounter any surprises down the track.  We found this method useful for budgeting purposes as by Contract stage, we were pretty much right on the mark in terms of pricing. 

A couple of weeks later, we met him again to sign the Sales Contract and pay our deposit of $2,000.00 inc GST.  This is non-refundable as it goes directly to soil testing and survey costs. 

Sales Stage Key Tips:
  • Go to the display home as many times as possible.
  • Ask questions as to what is included - never assume that anything is standard....even the look/facade is an 'extra'. 
  • Get a conservative quote to avoid disappointments down the track. 
  • Don't get bogged down with the aesthetics of the house - this will come later.  Focus on the "big ticket" and structural aspects. 
  • Do not be afraid to alter the plan of the house. e.g. changing/extending the size of the room - you will be surprised how accommodating PD can be with modification to their design (to an extent).
  • Ensure site costs are not undercooked. 
  • Be aware of PD's 'Out of Zone' charges.  If you are not building in an estate, there will most likely be an additional fixed charge. 
  • Ensure most things are in the Sales Contract as this will be incorporated into the Tender Document which will become part of the Building Contract.
As a final point, should you change your mind after you paid your initial amount, do not stress as there is plenty of time for you to change the structural aspects of your build and more time to change the aesthetics.